BIM / VDC
Solutions
Improving Project Delivery Through Digital Innovation
At Cobenco Construction, our project teams leverage cutting-edge digital technologies through Building Information Modeling (BIM) and Virtual Design & Construction (VDC) to enhance planning, coordination, and execution.
- Advanced 3D Modeling
- Real-time Collaboration
- Cost Optimization
- About Our Approach
Proactive Planning for Better Outcomes
Our experienced BIM / VDC specialists identify project constraints and system interactions early in the design phase well before construction begins. This proactive approach leads to safer operations, faster installations, reduced rework, improved productivity, and controlled costs.
Digital Environments
Create collaborative digital environments for multidisciplinary team coordination
Team Collaboration
Generate accurate cost estimates and schedules with seamless team integration
Early Detection
Detect potential clashes and conflicts before construction begins
Risk Reduction
Deliver optimized sequencing and risk reduction strategies
- Advanced Coordination
Model Coordination & Clash Detection
We utilize advanced coordination platforms such as Navisworks to integrate discipline-specific models and perform detailed clash detection. Our rigorous process ensures seamless integration across all building systems.
- Consultants typically deliver models at LOD 300 minimum
- Our team advances models to LOD 400–500 for full constructability
- Regular BIM/VDC model reviews allow us to identify and resolve conflicts before on-site work begins
- This process eliminates costly surprises during construction
- Why Choose BIM / VDC
Key Benefits of BIM / VDC
Our digital approach delivers measurable improvements across every phase of your construction project.
Early Conflict Identification
Detect design conflicts before construction begins, preventing costly on-site changes
Accurate Cost Estimation
Improved accuracy in cost
estimation and scheduling through digital modeling
Construction Sequencing
Enhanced construction sequencing and logistics planning for optimal workflows
Increased Site Safety
Improve safety through
comprehensive virtual planning and hazard identification
Faster Installation
Accelerated installation of systems and components through prefabrication planning
Reduced Rework
Minimize rework and change
orders through proactive
coordination
Project Transparency
Greater project transparency and
collaboration across all stakeholders